Chat
Online
Inquiry
Home > Vietnam helmet factory

Vietnam helmet factory

Shanghai Sunland Industrial Co., Ltd is the top manufacturer of Personal Protect Equipment in China, with 20 years’experience. We are the Chinese government appointed manufacturer for government power,personal protection equipment , medical instruments,construction industry, etc. All the products get the CE, ANSI and related Industry Certificates. All our safety helmets use the top-quality raw material without any recycling material.

Why Choose Us
Solutions to meet different needs

We provide exclusive customization of the products logo, using advanced printing technology and technology, not suitable for fading, solid and firm, scratch-proof and anti-smashing, and suitable for various scenes such as construction, mining, warehouse, inspection, etc. Our goal is to satisfy your needs. Demand, do your best.

Highly specialized team and products

Professional team work and production line which can make nice quality in short time..

We trade with an open mind

We abide by the privacy policy and human rights, follow the business order, do our utmost to provide you with a fair and secure trading environment, and look forward to your customers coming to cooperate with us, openly mind and trade with customers, promote common development, and work together for a win-win situation..

24 / 7 guaranteed service

The professional team provides 24 * 7 after-sales service for you, which can help you solve any problems

Certificate of Honor
Get in touch with usCustomer satisfaction is our first goal!
Email us
— We will confidentially process your data and will not pass it on to a third party.
Vietnam helmet factory
Calculations and Occupational Exposure Limits
Calculations and Occupational Exposure Limits

– prevent pollution of ,air,, water, etc. 34 Dilution ,Ventilation, Theory • Dilution ,ventilation, may be applied in situations where vapor concentration build-up and decay can be predicted. • Assumptions when applying equations: – perfect mixing in work ,area, – constant generation rate – clean dilution ,air, is used

How to Fold a Pirate Hat: 8 Steps (with Pictures) - wikiHow
How to Fold a Pirate Hat: 8 Steps (with Pictures) - wikiHow

5/3/2011, · ,Fold, the brim of the ,hat,. You will do this by ,folding, the bottom of the ,hat, upwards. ,Fold, the bottom part of the ,hat, below the triangle flaps upwards. Make your crease at the base of the triangular flaps. Flip the ,hat, over. ,Fold, the bottom flap of this side of the ,paper, up, matching your ,fold, from the other side. You have now folded the brim of ...

Basic Concepts of Ventilation Design
Basic Concepts of Ventilation Design

2/8/2010, · Bench Grinder Exhaust ,Ventilation, • However there are losses thru the grinder hood entry SP 2 = - (VP 2 + h e) where h e is the energy loss of the hood entry • Static pressure (SP) must decrease due to acceleration of ,air, up to the duct velocity • F h is defined as the energy loss factor (for that hood design) • Energy losses will be measured as a function of the velocity pressure in ...

12 Cooling Load Calculations
12 Cooling Load Calculations

Ventilation, Cooling Load ,Ventilation, latent load, (W) = mass flow rate x latent heat of vaporization x (humidity difference) = 3010 x l/s x (∆ẁ) or (4840 x cfm x ∆ẁ) Where ∆ẁ = Inside-outside humidity ratio difference of ,air, ( kg/kg) 47. ,Total, Cooling Load • This is also call the Grand ,total, load • …

Guidelines for Ventilation Requirements in Buildings
Guidelines for Ventilation Requirements in Buildings

The ,ventilation, rate required to provide the desired indoor ,air, quality is then calculated based on the ,total, pollution load, the available outdoor ,air, quality and the ,ventilation, effectiveness. The ,ventilation, rates required for health and comfort are calculated separately and the highest value is used for design.

Basic Concepts of Ventilation Design
Basic Concepts of Ventilation Design

2/8/2010, · Bench Grinder Exhaust ,Ventilation, • However there are losses thru the grinder hood entry SP 2 = - (VP 2 + h e) where h e is the energy loss of the hood entry • Static pressure (SP) must decrease due to acceleration of ,air, up to the duct velocity • F h is defined as the energy loss factor (for that hood design) • Energy losses will be measured as a function of the velocity pressure in ...

Air | Appendix | Environmental Guidelines | Guidelines ...
Air | Appendix | Environmental Guidelines | Guidelines ...

Ventilation, requirements for surgery and critical care areas. ,Area, designation ,Air, movement relationship to adjacent ,area, 2 Minimum ,air, changes of outdoor ,air, per hour 3 Minimum ,total air, change per hour 4,5 All ,air, exhausted directly to outdoors 6 Recirculated by means of room units 7 Relative humidity 8 Design temperature 9 (degrees F [C])

Ventilation Rules of Thumb | Resources - Solutions for Air
Ventilation Rules of Thumb | Resources - Solutions for Air

The illustration above demonstrates how to ventilate more than one ,area, using a single fan. To determine the amount of CFM required for your ,ventilation, equipment, ,calculate, the volume of the room (LxWxH) and divide it by the number of minutes per ,air, change. For example: Office A: 18'L x 18'W x 15'H = 4,860 ft 3

GUIDELINES FOR GOOD INDOOR AIR QUALITY IN OFFICE PREMISES
GUIDELINES FOR GOOD INDOOR AIR QUALITY IN OFFICE PREMISES

which are ,air,-conditioned and used as office premises in Singapore. 2.2 The indoor ,air, quality parameters addressed are carbon dioxide, carbon monoxide, formaldehyde, ozone, volatile organic chemicals, ,total, bacterial counts, ,total, fungal counts, suspended particulate matter, ,air, temperature, relative humidity, and ,air, movement.

How to Calculate Compressed Air Consumption
How to Calculate Compressed Air Consumption

Super Blast ,Safety Air, Guns provide the strongest blowing force - ideal for long distance, wide ,area, blowoff, cooling and drying applications. The comfortable foam rubber handle provides a firm grip. The spring-loaded valve instantly shuts off the ,air, supply if the ,air, gun is dropped. Extension Pipes for hard to reach areas are also available.

Requirements for Flood Openings in Foundation Walls and ...
Requirements for Flood Openings in Foundation Walls and ...

Figure 18: Example of non-engineered opening: Typical standard ,air vent, faceplate providing 42 square inches of net open ,area, if disabled in the open position; measurement of net open ,area, uses a slot width of 0.5 inch times a slot height of 0.65 inch times the ,total

OSHA Technical Manual (OTM) | Section II: Chapter 1 ...
OSHA Technical Manual (OTM) | Section II: Chapter 1 ...

11/2/2014, · Example ,Calculation, for Full-Period, Continuous Single Sample. A single glass-fiber filter and personal sampling pump were used to sample for carbaryl for an 8-hour period. The SLTC reported 6.07 mg/m 3. The SAE for this method is 0.23. The PEL is 5.0 mg/m 3. Step 1. ,Calculate, the exposure severity (using Equation 9 from Section III.K.2):

GUIDELINES FOR GOOD INDOOR AIR QUALITY IN OFFICE PREMISES
GUIDELINES FOR GOOD INDOOR AIR QUALITY IN OFFICE PREMISES

which are ,air,-conditioned and used as office premises in Singapore. 2.2 The indoor ,air, quality parameters addressed are carbon dioxide, carbon monoxide, formaldehyde, ozone, volatile organic chemicals, ,total, bacterial counts, ,total, fungal counts, suspended particulate matter, ,air, temperature, relative humidity, and ,air, …

What is the correct way to manually calculate air ...
What is the correct way to manually calculate air ...

Ventilation, rates are often expressed as a volume rate per person (CFM per person, L/s per person). The conversion between ,air, changes per hour and ,ventilation, rate per person is as follows: Rp= {ACPH*D*h/60. Where: Rp = ,ventilation, rate per person (CFM per person, L/s per person) ACPH = ,Air, changes per hour D = Occupant density (square feet ...

Basic Air Conditioning Formulas Figure 5
Basic Air Conditioning Formulas Figure 5

Basic ,Air, Conditioning Formulas Application Guide Basic ,Air, Conditioning Formulas TO DETERMINE COOLING ,Total, Airflow Infiltration or ,Ventilation, Number of ,Air, Changes Per Hour – ,Total, Number of ,Air, Changes Per Hour – Outdoor ,Air Total, Heat (HT) Sensible Heat (H S) Latent Heat (HL) Leaving ,Air, D.B. Temperature (T2) Enthalpy – Leaving ,Air, (h 2)

Discharge and vents | Plumbing
Discharge and vents | Plumbing

Discharges and ,vents, should comply with the size, material and performance requirements in Acceptable Solution G13/AS1.More information can be found here on water traps with single discharge outlet, water traps with multiple discharge outlets, sizing, discharge pipes, access points, venting discharge pipes, ,vent, pipes, WC pans – discharge pipes and venting, ,air, admittance valves, floor ...

Combustion air | Nations Home Inspections Inc
Combustion air | Nations Home Inspections Inc

Each opening has to have a net free ,area, of 120 in 2, which meets the requirement of 1 in 2 for each 1,000 BTU/hr. So if the openings will have a metal grill we need to allow for that, so each opening needs to have a ,total area, of 120/0.75, or 160 in 2. So each opening can be 13 inches by 13 inches square. Or 18×9, or even 53.3×3.

Laboratory Design Fundamentals - Madison ASHRAE
Laboratory Design Fundamentals - Madison ASHRAE

14/3/2016, · FH-,Total,. 600-3000. Supply ,Air,. 500-2735. 0.5 0.5 0.5. T. If 10 ACH Occupied = 800 cfm then, min supply ,air, = 800-300 = 500. General Exhaust must remove 200 cfm when sashes are closed. General Exhaust. ,air, valve 35 -200 cfm. FH-,Total,. 600-3000 + Gex min = 3,035. ,Air, Change Rate Flow Demand